Our realizations
List of projects made by BS Controls sp. z o.o.
10 2019 - Migration of the ash removal installation operator station software power units No. 1-10 - Kozienice Power Plant
Migration of the existing WinCC visualization from version 7.0 to version 7.4
WinCC 7.4
9 2019 - Control system for SCR fly ash handling instalation power unit No. 9 - Kozienice Power Plant
Programming and control system commissioning
Siemens S7-400H, 3 x S7-1200, 3 x WinCC SCADA
8 2019 - Control system for ESP fly ash handling instalation power unit No. 9 - Kozienice Power Plant
Programming and control system commissioning
Siemens S7-300, 27 x S7-1200, TIA Portal HMI, 3 x WinCC SCADA
7 2018 - Gypsum warehouse - Kozienice Power Plant
Correction of errors in the existing SCADA system
WinCC 7.0
6 2017 - Wagon tippler No. 1 - Kozienice Power Plant
Error correction of the existing control system
Siemens S7-300, TIA Portal HMI
5 2017 - Migration of the EF operator station software power unit. No. 7 - Kozienice Power Plant
Migration of the existing WinCC visualization from version 6.2 to version 7.0
WinCC 7.0
4 2017 - Renovation of cleaning system for coal slurry feeding points for boilers - Siersza Power Plant
Modification of existing software
Siemens S7-300 x 3, HMI, DCS via Modbus RTU
3 2017 - Wagon tippler No. 3 - Kozienice Power Plant
Prefabrication of the PLC cabinet, Programming and control system commissioning
Siemens S7-300, TIA Portal HMI
2 2017 - ESP control system of a waste incineration plant - ZTUO Szczecin line nr 1 i 2
Programming and control system commissioning
Siemens S7-300, TIA Portal HMI, HV units communication over Modbus TCP, DCS communication over Profibus DP
1 2017 - Measurement of pumps in the PB3 dumpyard at Kozienice Power Plant
Programming and control system commissioning
Siemens S7-300, ET-200S